SCBL   Portland Composite Cement    
   
 
   
 
   
 
 
     
 
 
   
     

 

   
Specification and Composition:
BDS EN 197-1:2003, CEM-II/B-M(S-V-L), 42.5 N

Clinker                          : 60-79%
Slag, Fly ash & Limestone: 21-35%
Gypsum                         : 0-5%

 

   
Test Results:
 
       

Test

Age

Standard
Requirements

BUET Test
Results

 Compressive Strength (Psi)
3 days 1740 2000-2400
7 days 2760 3000-3400
28 days 4060 4200-4500
 Setting Time (minutes)
Initial >45 160-180
Final <375 270-320
 Finesness, mm²/gm
    3800-4000
 Water Cement Ratio
 (for concrete, slump 3" to 4")
   

0.38-0.45

 

 
       
BUET Test Result:    

BUET TEST RESULT of SEVEN RINGS CEMENT 

Requirement

American Standard (ASTM)
3 -days 7 -days 28 -days
1740 psi 2760 psi 4060 psi
(12.0 MPa) (19.0 MPa) (28.0 MPa)
Month
BUET 
Ref. No.
Seven Rings Cement BUET TEST Result
3-days 7-days 28-days
Jan-08 6003/07-08/CE
2500 psi
(17.2 MPa)
3350 psi
(23.1 MPa)
4630 psi
(31.9 MPa)
Mar-08 8030/07-08/CE
2930 psi
(20.2 MPa)
3310 psi
(22.8 MPa)
4660 psi
(32.1 MPa)
May-08 0838/17-18/CE
2380 psi
(16.4 MPa)
2940 psi
(20.3 MPa)
4070 psi
(28.1 MPa)
Jul-08 0558/08-09/CE
2860 psi
(19.7 MPa)
3530 psi
(24.3 MPa)
5170 psi
(35.7 MPa)
Sep-08 2848/08-09/2008
2920 psi
(20.1 MPa)
4030 psi
27.8 (MPa)
4920 psi
(33.9 MPa)
Nov-08 5060/08-09/CE
2560 psi
(17.7 MPa)
3430 psi
(23.6 MPa)
under test
 
BUET Test Result Scanned Copy:    
   
Download  :   PDF Version
   
 
 
 
     
 

Products of SCBL

     
  Ordinary Portland Cement
 

Pozzalan Portland Cement

  Portland Composite Cement
  Slag Cement
  Bag Plant
  Hollow Bricks
     
 

Hot Line : 880-2-8817690

 
Head Office:
Landview(7th Floor), 28 Gulshan North C/A, Gulshan Circle-2, Dhaka-1212.
Fax: 880-2-8811926, 8837516; Email: info@sevencircle-bd.com
 
 
 

 
Home | Sitemap | Contact Us
© Copyright 2009 Shun Shing Group; All rights Reserved.